↑

Optical Frames: Metal, Stainless and Acetate From One Line

Monel and stainless wire stamped, tumbled, polished and plated in-house; acetate and TR90 cut on the same benches as our sunglass fronts. Full-rim, semi-rimless and rimless, MOQ 300 pcs per colour — 5–7 days with your logo, 25–35 days on a new tool.

3material lines: metal, acetate, injection
5–7dayslogo and packaging on stock moulds
25–35daysOEM / ODM, tooling to bulk
300pcs minimum order per colour
OPTICAL IS THE LINE WE ARE BUILDING

An optical frame is judged on three things a sunglass is not

Boxed dimensions have to hold, the bridge has to sit on a nose without sliding, and the finish has to survive a lens being glazed into it. All three are decided before the frame is polished — which is why the drawing, the tool and the plating bath sit in the same building.

Metal first: monel (cupronickel) wire stamped, tumbled, polished and plated on our own line. Stainless where the rim has to be thin and stiff. Acetate blocks are cut and tumbled on the same benches as our sunglass fronts, so a colour approved on a sunglass programme can be matched on an optical frame.

Constructions: full-rim, semi-rimless with a nylon lower rim, and rimless with drilled lenses and polished edges. Temples are fitted with barrel or spring hinges, screwed to your drawing.

The count is small today — three frames in production — because optical is the line we are building out now. The tooling, the plating and the acetate bench are already here; what we are adding is shapes.

Established1994
OwnershipWholly-owned enterprise, USD 6 million total investment
PlantsLinhai (Duqiao, Taizhou) and Wenzhou, Zhejiang
Floor area8,000+ m²
Workforceabout 500, including 48 technicians
Optical frames in production3 styles, more being added weekly
Constructionsfull-rim, semi-rimless, rimless
Materialsmonel, stainless steel, acetate, TR90, PC
Finishingpolished and plated in-house
Demo lensclear demo lens fitted as standard
MOQ300 pcs per colour
Light customisation5 – 7 days: logo and packing
Deep customisation25 – 35 days: drawing to bulk
CertificationCE · ISO 9001/9002
THREE MATERIAL LINES

Metal, acetate, injection — one plating bath, three price points

Pick the line by what the frame has to do, not by what looks expensive. Each line keeps its own tooling, so a repeat order never re-pays for a mould.

Material line

Monel wire

Cupronickel, stamped and tumbled, then polished and plated in-house. The default for a first optical programme: light, springy and cheap to retool.

Material line

Stainless steel

Stiffer and thinner — for slim retro rounds and rims that must not flex when a lens goes in.

Material line

Acetate

Blocks cut and tumbled on the sunglass benches. The colour comes from the block, not from paint, so it can be matched to a sunglass programme.

Material line

TR90 and PC

Injection for frames that have to weigh nothing, in the same presses and the same colour chips as our sunglasses.

3 constructions

Full-rim, semi-rimless, rimless

Full-rim in metal or acetate; semi-rimless with a nylon lower rim; rimless with drilled lenses and polished edges.

Finish

Plating and finish

Colour signed off on a physical chip before bulk. No chip, no run — plating shifts with bath chemistry and a photo will not hold it.

IN PRODUCTION NOW

Current optical frames

Each card opens the full specification: frame width, lens width, bridge, temple, material and packing data.

Ten more shapes in the photo queue Optical is the line we are expanding now — new fronts are being photographed this month. Ask for the line sheet and we send the drawing files with it. Open the product centre
CONSTRUCTION

Three constructions, and what each one costs you

The same lens can be a full-rim, a semi-rimless or a rimless frame. What changes is assembly time, lens choice and how the frame behaves after a drop.

ConstructionHow it is builtWhere it fits
Full-rimFront and rim in one piece, acetate or metal; the lens is fitted from the front.The safest first order: strongest, cheapest to assemble and the widest lens choice.
Semi-rimlessMetal top rim, nylon wire bottom; the lens is grooved and snapped in.A slimmer look at a metal price; the shape men's business frames usually take.
RimlessNo rim: the lens is drilled and mounted on screws or plugs, edges polished.Lightest and least visible; needs a lens that can be drilled — PC or nylon, not acrylic.
On the drawing Send a technical drawing with boxed dimensions, or a physical sample with a note on what has to change. We quote tooling against it and return a first shot with the dimensions measured, not estimated.
TESTING

Dimensions, hinge life and plating, checked before the box

An optical frame fails in the field for three reasons: it does not fit, the hinge gives up, or the plating goes. We check the same three.

Dimensions and fit

  • Boxing, bridge and temple length measured against the drawing at first shot and again at the end of the run.
  • Pad angle and bridge width set per market; Asia-fit pads on request.
  • Temple bend and tip length checked on a head form, not on a flat table.

Hinge and plating

  • 500 cycles: the open-close test in GB/T 14214, the Chinese national standard for spectacle frames.
  • 5,000 cycles: our own jig, folded leaf only. This is not a GB/T figure.
  • Plating colour signed off on a chip, screws torqued and thread-locked before packing.
LEAD TIME

Two lead times, because there are two kinds of order

A logo on an existing front ships in a week. A drawing that has to become a tool takes a month. Both numbers are quoted on the same sheet.

FAST LANE · STOCK MOULD

5 – 7days

Your logo on the temple, your colour on an existing front, your packing. No tooling cost, no new sample round unless you ask for one.

Day 1

Artwork and frame choice

Logo file, Pantone reference, and which front from the line sheet.

Day 2–3

Logo and plating proof

Temple print proofed on the frame; plating colour matched to your chip.

Day 4–5

Assemble and pack

Demo lenses fitted, temples mounted and aligned, cases and cartons printed.

Day 6–7

Inspection and ship

AQL 2.5 on the finished lot, marks to your spec, FOB Ningbo or Shanghai.

DEEP LANE · OEM / ODM

25 – 35days

A drawing, a competitor sample or a shape that has to hold a specific lens. Tooling, first shot, approval and bulk inside 35 days.

Day 0–3

Drawing and quotation

Boxed dimensions, material and finish. Tooling is quoted as its own line.

Day 4–10

Tooling and first shot

Mould cut, first shots run, dimensions measured against the drawing, sample shipped in 5–7 days.

Day 11–15

Approval

Pantone, plating chips, pad angle and temple bend signed off.

Day 16–25

Pilot and in-line QC

Pre-production run checked at roughly 30% and 70% of the line.

Day 26–35

Bulk and shipment

AQL 2.5 final inspection, carton marks to your spec, FOB Ningbo or Shanghai.

The two dates that move Only two things push the date: drawing approval and plating-chip sign-off. Approve either on the day and the clock starts that day — time spent waiting on a buyer is not counted against the quoted days.
BUYER QUESTIONS

What buyers ask before the first optical order

What is your minimum order?

300 pcs per colour on stock moulds. A new tool is quoted separately and is not refundable, because the mould is cut to your drawing.

Can you supply frames without lenses?

Yes. Frames ship with clear demo lenses fitted; glazing stays with your lab unless you ask us to quote it.

Which material should a first optical programme use?

Monel if the price matters, stainless if the rim has to be thin, acetate if the frame is the product. All three run through the same plating line.

Can you match a drawing or a competitor sample?

Yes — send the drawing with boxed dimensions, or the sample with a note on what has to change. We come back with tooling cost and a first-shot date.

How do you handle sizing?

Sizes are quoted per shape. Tell us the eyesize, bridge and temple length your market sells and the drawing is kept to it.

How are frames packed?

1 pc per polybag with temple tips protected, 12 per inner, 300 per carton; carton marks and barcodes follow your instruction.

TRADE TERMS & LEAD TIME

The terms, printed before anyone asks

Sample terms, bulk terms and the two lead times, in the same place on every page. Nothing here is a range we would walk back from a quotation.

TRADE TERMS
  • EXW for sample orders (via Express).
  • FOB Shanghai/Ningbo for bulk cargo (via Sea/Air).
  • Final terms negotiable based on buyer requirements.

Samples travel by express under EXW, so the freight account is yours and the tracking number is ours to chase. Bulk moves FOB Shanghai or Ningbo, by sea or air, whichever the schedule needs. If your market works on different terms, say so at quotation — it is a commercial question, not a production one.

LEAD TIME
  • 5-7 days for light customization (Logo & Packaging).
  • 25-35 days for full OEM/ODM production.

Two lanes, quoted separately, named on the same sheet.

When the clock starts The day artwork and the signed colour or appearance chip come back. Time waiting on your side is not counted.

Send the drawing, get tooling cost and a first-shot date

Boxed dimensions or a physical sample, plus the market you sell into. We reply with tooling cost, unit price and lead time within one working day.